Daily maintenance of sanding machine

- Mar 01, 2018 -

First check: 4 hours after new machine starts to use or replace

Second check: 1 days after interval

Third check: 3 days after interval

Fourth check: 5 days after the previous inspection interval

Fifth check: 7 days after the previous inspection interval

After the check: every other week

Sanding machine in the replacement belt should be noted: if one of the same pulley on a break to be replaced, it is necessary to replace the same belt pulley on the other belt.


Related Products

  • Double Head Door Locks Drilling Jig and Milling Machine for Making Doors Hinge Drilling MXD206D
  • MD45SA Woodworking Automatic Edge Bander Machine with Auto Pre-milling
  • MJ3125 CNC Computer Controlled Panel Cutting Saw Machine
  • FMM616 Woodworking Four Side Moulder Machine with 6 Spindles Can Be Planer Machine
  • CNC Computer Router Cutting Machine Center for Wood Design and Drilling
  • High Quality Diamond Woodworking Cutter and PCD Router Bit